
The span between Detroit and Canada has experienced holdups that could extend the opening to 2026, per the Windsor Star, even though the project is 98% complete.

The span between Detroit and Canada has experienced holdups that could extend the opening to 2026, per the Windsor Star, even though the project is 98% complete.